ALBANY HIGHWAY–MENANG DRIVE — INTERCHANGE
1122. Hon Dr STEVE THOMAS to the Leader of the House
representing the Minister for Transport:
I refer to the approval given to
Main Roads WA to construct the Albany ring-road.
(1) Was the stage
3a location proposal area at the Menang Drive and Albany Highway proposed
graded interchange changed between 2019 and 2021?
(2) If yes to (1), what changes were made, and please
provide maps of the proposal before and after the changes?
(3) Was the design for ramp 3 at the Menang Drive and
Albany Highway proposed graded interchange changed between 2019 and
2021?
(4) If yes to (3), what changes were made, and please
provide maps of the proposal before and after the changes?
Hon SUE
ELLERY replied:
I thank the honourable member for
some notice of the question.
(1)–(4) Changes
were made so that Menang Drive passes over the top of Albany Highway instead of
underneath. This necessitated appropriate geometric realignments.