Question Without Notice No. 1157 asked in the Legislative Council on 16 October 2019 by Hon Dr Steve Thomas

Parliament: 40 Session: 1

FORRESTFIELD–AIRPORT LINK — DEWATERING

1157. Hon Dr STEVE THOMAS to the minister representing the Minister for Transport:

I refer the Forrestfield–Airport Link project, and the report in this week's The Sunday Times telling us that tunnel boring is now occurring under the Swan River.

(1) Does the project include dewatering?

(2) What amount of water has been produced in dewatering?

(3) Where has that water been disposed of?

(4) Has any of the water been disposed of into the Swan River system?

(5) If yes to (4), did any of that water entering the Swan River system contain PFAS; and, if so, at what concentrations?

Hon STEPHEN DAWSON replied:

I thank the honourable member for some notice of the question. The following information has been provided to me by the Minister for Transport.

(1) Yes.

(2) Approximately 656 000 kilolitres has been produced.

(3) The majority of water has been disposed of via onsite reinjection, with a smaller amount to the sewer.

(4) No.

(5) Not applicable.