WATER CORPORATION —
WATER PIPES — BEAUFORT ST, INGLEWOOD
1293. Hon Dr STEVE THOMAS to the minister representing the
Minister for Water:
I thank the Minister for Emergency Services;
the previous answer was very generous.
I refer to the Water Corporation's
upgrade of pipes along Beaufort Street, Inglewood, between Central Avenue and
Dundas Road that commenced on 21 August 2022 and, according to the information
given to businesses in the area, was due to finish within six weeks.
(1) What was the budget for this
part of the pipe renewal project?
(2) Did the contract specify a time
frame for this part of the project; and, if so, what was that time frame?
(3) What were the
key performance indicators in the tender contract in relation to the start date
and the finish date, and have these been met?
(4) If no to (3), why not?
(5) If no to (3), what penalties
does the contract impose?
Hon
ALANNAH MacTIERNAN replied:
I thank the member for the
question.
(1)–(5) The
answer is not available in time for today; however, it will be provided prior
to 1 December 2022. I am obviously going to have difficulty delivering on that,
but perhaps I can commit to providing it by 1 December 2022.